The Arizona Department of Transportation has started an erosion control project on US 70 at Salt Creek, about 30 miles east of Globe on the San Carlos Apache Reservation. The work consists of construction of erosion control and slope stabilization at the outlet of three 13 foot diameter pipe culverts. The work is on the south side of the highway with construction traffic leaving and entering the highway. ADOT advises drivers to slow down and be alert for construction vehicles and workers. The project is scheduled for completion by the end of April.
No comments:
Post a Comment